VOAT Engineering Services

Procurement support – URS, Equipment Specification, TBA, CBA, TR, BOM, GAD approvals, FAT & SAT​

1. User Requirement Specification (URS):
– Requirements Gathering: Describe how the consultancy engages with clients to gather and document detailed user requirements for the procurement of equipment or systems.
– Functional Specifications: Explain the process of translating user needs into functional specifications within the URS, ensuring clarity and alignment with project objectives.

2. Equipment Specification:
Technical Specifications: Highlight the consultancy’s capability to create detailed technical specifications for the procurement of specific equipment or systems. This includes parameters such as size, capacity, performance criteria, and any specific standards or certifications required.
– Compliance: Emphasize the importance of ensuring that equipment specifications comply with industry standards, regulatory requirements, and client expectations.

3. Technical Bid Analysis (TBA) and Commercial Bid Analysis (CBA):
– Bid Evaluation: Describe the consultancy’s role in evaluating both technical and commercial bids from potential suppliers or contractors.
– Vendor Selection: Explain how the consultancy assists clients in selecting the most suitable vendors based on a thorough analysis of technical capabilities, pricing, and other relevant factors.

4. Technical Review (TR):
– Review Process: Outline the consultancy’s procedures for conducting technical reviews, ensuring that the proposed solutions align with project requirements and specifications.
– Quality Assurance: Emphasize the importance of quality assurance in the technical review process to guarantee that selected equipment or solutions meet the highest standards.

5. Bill of Materials (BOM):
– Component Listing: Detail the creation of a comprehensive Bill of Materials, listing all the components and materials required for the procurement and assembly of the specified equipment or system.
– Cost Estimation: Discuss how the BOM is used for accurate cost estimation, helping clients budget effectively for the procurement process.

6. General Arrangement Drawing (GAD) Approvals:
– Visualization: Explain how the consultancy creates General Arrangement Drawings to visually represent the layout and positioning of equipment within a facility.
– Client Approval Process: Describe the steps involved in obtaining client approvals for the GAD, ensuring alignment with project goals and spatial requirements.

7. Factory Acceptance Test (FAT) and Site Acceptance Test (SAT):
– Quality Assurance: Highlight the consultancy’s involvement in planning and conducting Factory Acceptance Tests, ensuring that procured equipment meets the specified criteria before installation.
– On-site Verification: Explain the process of Site Acceptance Testing, conducted to verify that the installed equipment functions correctly within the operational environment.

8. Project Success Stories:
– Case Studies: Present case studies or success stories that demonstrate the consultancy’s successful contributions to the procurement process, emphasizing positive outcomes and client satisfaction.

Leave a Comment

Your email address will not be published. Required fields are marked *